This content has been archived.

Our sorting materials guide provides end-to-end guidance on Materials Recovery Facilities (MRFs) compliance, regulation, material sources, quality output, and the key aspects of running a successful sorting and reprocessing operation.

There are a number of strict regulations MRFs operators must abide by whilst also developing technological and testing processes and best practices to ensure both compliance and efficiency. This includes the value, volume and quality of material as well as the testing processes involved in the Environmental Permitting Regulations 2014.

Download files

By downloading resources you are agreeing to use them according to our terms and conditions.

These files may not be suitable for users of assistive technology.

  • WRAP-pb14150-mrf-guide.pdf

    PDF, 54.91 KB

    Download
  • WRAP-WRAP Plastics Compositional Analysis FINAL v2b_May 1 2015_0.pdf

    PDF, 1.38 MB

    Download
  • WRAP-Materials facilities regulations information sheet.pdf

    PDF, 321.79 KB

    Download
  • WRAP-MRF Output Material Quality Thresholds Report.pdf

    PDF, 346.87 KB

    Download
  • WRAP-MRF Quality Assessment Study.pdf

    PDF, 342.94 KB

    Download
  • WRAP-RecoveringValueMRFs.3644.pdf

    PDF, 754.52 KB

    Download
  • WRAP-MF Sampling Guidance April 2014.pdf

    PDF, 2.54 MB

    Download
  • Sampling procedure flow chart and sampling requirements 7 0 FINAL.pptx

    PPTX, 244.15 KB

    Download
  • WRAP case study - Bywaters (Leyton) Ltd MRF.pdf

    PDF, 3.08 MB

    Download
  • WRAP case study - Milton Keynes MRF.pdf

    PDF, 319.89 KB

    Download

Tags